Over time, the site of Gate 21 at Neyland Stadium had matured into a worn, confused space where the quality of daily student life became secondary to the functional needs surrounding the programming and activity of seven home football games each year. Pedestrian routes through the site became circuitous and marginalized by the competing loading, staging and parking of vehicles. Areas for congregating did not exist for those attending nearby classes and events most of the year, and on game day, patrons found the space severely overcrowded and unsafe. Gate 21 was entirely a pass-through space incapable of carrying the capacity it needed and lacking the sense of place and identity it deserved as a campus landmark.

Option3_Before

afterNeyland site plan rendering_promo

As subconsultants to McCarty Holsaple McCarty, a Knoxville architectural firm who had worked with University planners and athletic department representatives to identify phased improvements for Neyland Stadium, CRJA’s Knoxville office collaborated with design team members and project stakeholders to conceptualize a new plaza and amphitheater outside Gate 21. The design of these two spaces successfully balances the activities of tens of thousands of game-day patrons with the needs and comfort of daily student life, including dozens of bus transfers each day. From initial site programming to final construction documentation, CRJA also found ways to embrace innovative technologies that would help the larger campus objective of developing sustainable sites. For example, in order to promote a healthy viable tree canopy of shade for the plaza over time, large volumes of planting soil were contained in structural cells that also support the pavement and vehicular loading above. To improve the quality of run-off exiting the site, permeable pavement was also installed in intercepting bands to slow and cool stormwater, while reducing the pollutants typically found in total suspended solids.

In 2011, the project received an Honor Award from Tennessee’s Chapter of the American Society of Landscape Architects, as well as a Governor’s Environmental Stewardship Award from the State’s Department of Environment & Conservation.

Here are some additional before, during construction, and after photos:

Amphitheater & Plaza

Option1_Before Option1_AmphitheaterPlaza_fromwikipediacommons_ConstructionNeyland Stadium

Plaza

Option2_Before

Option2_Plaza_fromothersonline_Construction

Neyland Stadium

Amphitheater

Option4_Before Option4_Amphitheater_fromothersonline_Construction Option4_after